SCHEME—QCAddNew Form
This form is used to add quality control types for schemes.
Related Processes
Flows:
- OK—Close the form and add the quality control type for the scheme.
 - Cancel—Close the form and cancel the addition of the quality control type for the scheme.
 
Form:
- QC type code—The base quality control type. Either BLK (Blank) or STD (Standard).
 - QC code—The code of the quality control type.
 - Scheme code—The code of the scheme to set analytical limits for the quality control type.
 
