View the Stockpile Breakdown at the Time of a 3D Transaction

Security Note: You need the Allow the user to open the 3D stockpile viewer security right in the 3D user group security rights group for this activity.

Activity Steps

  1. Open the 3D Transaction Viewer.
  2. Select the transaction in the Transactions table, or find the transaction.
  3. Select the Breakdown tab, which displays the breakdown of the total stockpile data, as at the time of the selected 3D transaction.
  4. To modify the display of the data on the Breakdown (sub)tab, which displays the breakdown of the stockpile data, summarised into sections of the stockpile along the Y-axis.:
    1. Click More to display all options.
    2. Update the following fields as required.
      • Section Width—Width of the stockpile sections (along the Y-axis) for stockpile data display. Default: 25 m.
      • Show Contributors—Select from No Contributor Group Selected or the contributor groups defined on the Quality panel of the Solution Explorer.
      • Contributor Value Format—Select from Metric Tonnes, Metric Tonnes (Percent) or Percent.
      • Group By—Select from (None), Product, Product Category or Movement Product.
      • From X Coord
      • To X Coord
      • From Y Coord
      • To Y Coord
      • From Z Coord
      • To Z Coord
      • Display Analytes—If checked, a column displays for each analyte for which there is transaction sample data.
      • Display Empty Records—Whether to display rows in the breakdown table for sections that have no stockpile data. Empty records represent sections of the stockpile with no material.
      • Show Selection On 3D View—Whether to highlight the selection on the stockpile view. Only applicable if View Type is 3D View on the View Options tab.
    3. Click Refresh.
  5. To view a list of individual transactions (batches) up to the selected 3D transaction, select the Selection tab.