Enter a DU Draft Survey for a Service Trip
A discrete unit (DU) draft survey with a back calculation corrects the quantities of the DU loading or unloading movements.
Note: A DU draft survey can only be entered or modified if the applicable DU movements are in their last state. For example:
• If packages have been loaded onto and then unloaded from the service trip, a DU draft survey can no longer be entered at the loading location.
• If packages have been loaded onto a service trip and included in a DU draft survey at the loading location, and then the packages are unloaded, the DU draft survey can no longer be modified.
Security Note: You need the Allow barge draft surveys security right in the Barge Despatches domain security rights group for this activity.
Activity Steps
- Open the Service Trip.
- Select the required route point in the Route diagram.
- Select the DU Draft Surveys tab.
- Select a Despatch Order if required. The DU draft survey can be specific to a despatch order. If a despatch order is selected, only movements associated with the despatch order display for allocation to the DU draft survey.
- Right-click in the DU Draft Survey field group and select New from the menu.
- Complete the following fields.
- Start Date—Default: The first available date out of the Actual End (Un)Loading date, Actual Start (Un)Loading date or else the current date.
- End Date
- Name
- Gross Mass—This field is read-only if a back calculation has been applied using the DU draft survey.
- Unit—Unit of measure for the DU draft survey mass. Select from the Mass units defined in the Unit Conversion Editor. This field is read-only if a back calculation has been applied using the DU draft survey.
- Draft Surveyor—Select from the organisations and companies defined on the Organisations panel of the Solution Explorer and that have the Organisation Role of Draft Surveyors.
- Surveyor Contact—Select from the contacts associated with the selected Draft Surveyor organisation.
- First Reading
- Second Reading
- Third Reading
- Readings Unit—Unit of measure associated with the DU draft survey readings. Select from the Length units defined in the Unit Conversion Editor.
- Check Selected in the DU Draft Survey Movements field group for each movement to which the DU draft survey applies.
- Click Back Calc.
This button is only enabled if a DU draft survey has been created and associated with at least one movement.
- Confirm the back calculation.
MineMarket updates the selected movements on the service trip.
- If a movement needs to be edited, the DU draft survey must be rolled back. To roll back a DU draft survey:
- Select the DU draft survey.
- Click Rollback.
- Click Save.