Record Transport Events for a Supply Train or Ship

You can only assign transport events to route points where the route was added using a predefined route. Transport events cannot be assigned to dynamic route points.

Security Note: As applicable for the transport type, you need the Allow supply train maintenance or Allow supply ship maintenance security right in the Supply user group security rights group for this activity.

Activity Steps

  1. Open the Supply Train or Supply Ship.
  2. Select the required route point in the Route diagram.
  3. Select the Event tab.
  4. To use a transport event template to add transport events, select a Transport Event Template. Select from the transport event templates defined on the Train Transport Events, Truck Transport Events, Barge Transport Events or Shipment Transport Events screen.
  5. To add a transport event without using a template:
    1. Right-click in the Event tab and select New » Event from the menu.
    2. Select the Event. Select from the train transport events or shipment transport events defined on the Transport panel of the Solution Explorer.
  6. Complete the following fields for each transport event as required.
    • Start Date
    • End Date—Required if Has Duration is checked for the transport event configuration.
    • Comments
  7. Click Save.