Select Reserves Workflow Method
To access this task:
-
Setup ribbon >> Method.
Studio OP's managed reserves workflow can be approached in one of two ways:
- You can generate your own mining blocks based on an input model, topography, phase, strata and bench definitions or;
- You can import existing block volumes, either created by Studio OP or another product or method.
If you choose to generate your own mining blocks, your project's strata (optional), phases and benches will need defining, in addition to a pit, topography and model. In this case, you will be able to access all of the interactive design and block reserves generation tools that Studio has to offer.
If you choose to import blocks, much of the reserves workflow tasks on the Setup, Design and Reserves ribbons will be disabled as it is no longer relevant. This method lets you import block data (using the Import task), evaluate your imported blocks and schedule them (either using manual or automatic scheduler functions). You will still be able to access all Studio OP functionality unrelated to mining block generation.
See Importing Blocks.
Method Selection Impact
Selecting a workflow method fixes your current project into a mode that will determine downstream functions. To do this, it is necessary to reset your working database.
You can change your method after initial selection, but doing so will invalidate you project data so far. This means:
- If changing from the "Generate Blocks Method" to the "Import Blocks Method", all data apart from the defined model, pit definition and topography will be deleted before the new mode is set. This will automatically disable all tasks associated with block and pit design and generation on the Setup, Design and Reserves ribbons. The Import task, however, becomes enabled.
- If changing from the "Import Blocks Method" to the "Generate Blocks Method", all imported data will be removed from your project before the new mode is set, apart from the defined model, pit definition and topography. In this case, all block and pit generation tasks become active. The Import task becomes disabled.
If you wish to change your reserves workflow method, it is recommended that you make a backup copy of your project first.
Because of the potential impact on existing data, you must confirm your choice before you can proceed.
Note: The workflow method is set per-project; it is not possible to choose
one method for one pit, and a different method for another.
Reserves Workflow Tasks by Method
The following table displays the managed reserves workflow task accessibility for each of the available methods:
|
Setup Ribbon |
|||
|
|
Manage |
|
|
|
|
Surface Topo |
|
|
|
|
Define Method |
|
|
|
|
Define Model |
|
|
|
|
Validate Model |
|
|
|
|
Model Attributes |
|
|
|
|
Import Blocks |
X |
|
|
|
Define Phases |
|
X |
|
|
Define Strata |
|
X |
|
|
Define Benches |
|
X |
|
Design Ribbon |
|||
|
|
Define Slopes |
|
X |
|
|
Shell Contours |
|
X |
|
|
Ramp Layout |
|
X |
|
|
Auto Design |
|
X |
|
Reserves Ribbon |
|||
|
|
Add DTMs |
|
X |
|
|
Create Solids |
|
X |
|
|
Strata Solids |
|
X |
|
|
Bench Solids |
|
X |
|
|
Timeframe |
|
X |
|
|
Auto (Blocks) |
|
X |
|
|
Manual (Blocks) |
|
X |
|
|
Block Attributes |
|
X |
|
|
Evaluate |
|
|
|
|
Reserves Attributes |
|
|
|
|
Spatial Dependencies |
|
|
|
|
Sequence |
|
|
|
|
Data From Model |
|
|
|
|
Create Data Set |
|
|
Note: Tasks and commands not listed above are available to both reserves workflow methods.