Change EPS Column

Associating a data column to an EPS schedule

Change EPS Column

To access this dialog:

  • Right-click any visual object in the Sheets control bar and select Link to EPS.

Connect your sequenced 3D wireframe design data (e.g. as sequenced using Datamine Studio 5D Planner or Studio OP) with your generated Enhanced Production Scheduler schedule and visualize 3D window design segments and how they relate to individual activities. Data selection can be performed in both Studio and the standalone EPS application.

There are a few things you need to put in place before you can start to make use of EPS InTouch :

  • An existing EPS schedule must be generated from your current data set. This means you will have completed your mine design up to and including setting dependencies and sequencing.
  • The sequenced data (e.g. sequenced wireframes representing underground workings and stope development) must be loaded into your application.
  • You have 'mapped' a numeric data column using the Sheets control bar.
  • EPS must be running on the local system.
  • You have arranged your viewing windows to accommodate both applications - dual monitors are an ideal setup for this task.

There is only one field on this dialog - a drop-down list that will show all numeric data columns that can be mapped (potentially) to an active EPS schedule activity.