Command Name

Menu

Quick Key

Link to Command Table

scheduling-control

Command line only

fa

Click here

Description

Control of scheduling face progression.

How to use

  1. Run command

  2. Enter face separation angle

  3. Enter face extension distance

  4. Production faces may comprise a number of adjacent string segments. However, when two separate faces in the same production block mine towards each other, they must remain separate even when they meet each other. The supplied face separation angle defines when adjacent face segments will be treated as separate faces.

  5. You may want projected faces to remain at their original length, or to have them extend out sideways, before testing if they truncate against the side of the original perimeter. The face extension distance controls this function. If either end of the face does not intersect the perimeter, that end will be left unaltered.