Configure Drill Integration Fault Reprocessing Times
Configure reprocessing times if faults should be reprocessed as a batch; for example, at a time of day when drilling is likely to be complete. If you do not configure reprocessing times, faults are reprocessed at calculated times.
Note: This activity is not needed for WencoMine because that interface uses a database timestamp to identify which log entries need to be processed. See Configure WencoMine Drill Integration.
Activity Steps
- On the DataBlast Application Menu, select Site Maintenance.The Site Maintenance screen displays. 
- Select the Service Control node.
- Select the Drill Machine Import » IMS Reprocessing Times tab.
- To add a reprocessing time:- Click Add Process Time.
- Enter the Time of Day in the format HH:MM:SS.
- Select the Drill Machine System to Reprocess from Atlas Copco, Atlas Copco Auto, Carlson, Flanders, IMS, Jigsaw, MiPlan, Modular, Terrain, WencoLite and WencoMine.Note: You can select multiple systems for each reprocessing time, and you can select both active and inactive drill machine integrations in this configuration. 
 
- To remove a reprocessing time:- Click the arrow row selector for the time.
- Press Delete (on your keyboard).A confirmation message displays. 
- Click Yes.
 
- Click Save Changes.