Unload Discrete Units from a Shipment

A movement flow with the unloading port location as a source is required for shipment discrete unit (DU) unloading. For shipments created using a template, the template may limit the available movement flows and destination DU locations.

Security Note: You need the Allow shipment loading/unloading security right in the Shipments domain security rights group for this activity.

Activity Steps

  1. Open the Shipment.
  2. Ensure that a Vessel/Ship is assigned to the shipment.
  3. Select the unloading route point in the Route diagram.
  4. Ensure that Loading / Unloading in the shipment header field group is Unloading. This setting depends on the route configuration. See Edit the Route of a Shipment.
  5. Select the Package Unloading tab.
  6. To select packages:
    1. Select the Package Unloading sub-tab.
    2. Enter the following search criteria in the Criteria field group as required.
      • Start Date—Default: Two months prior to the current date at 00:00:00.
      • End Date—Default: The current date at 23:59:59.
      • Product—Select from the products and brands defined on the Material panel of the Solution Explorer.
      • Storage Type—Product basis of packages. Select from Bulk Only and Packages Only.
      • Name—Multiple names can be entered as a comma-separated list. Names can also be copied from a column of an Excel spreadsheet. When the clipboard contents are pasted into the Name field, MineMarket converts the data to a comma-separated list. When searching for multiple names, only exact matches are included in the search results. Text searches are case-sensitive with SQL databases with a case-sensitive collation and with all Oracle databases.
      • Location—Select from the discrete unit locations, discrete unit divisions, and despatch locations defined on the Supply Chain panel of the Solution Explorer. Despatch locations are rail sidings, truck despatch locations, barge terminals and port locations.
      • Batch—Text searches are case-sensitive with SQL databases with a case-sensitive collation and with all Oracle databases.
    3. Click Search or press F3.

      The Packages table displays packages that match the search criteria and:

      • Have a selectable status (if the Package status definition exists)
      • Are not in a package group
      • Are on the shipment

      Rejected packages are red. Recycled packages are green.

    4. Check Selected for each package to be unloaded.
  7. To select package groups:
    1. Select the Package Group Unloading sub-tab.
    2. Enter the following search criteria in the Criteria field group as required.
      • Start Date
      • End Date
      • Product
      • Storage Type—Storage type of package groups. Select from Bulk Only and Packages Only.
      • Name
      • Location
      • Despatch Order—Select from the despatch orders associated with the despatch. If set to All, the search returns package groups associated with any despatch order that is on the despatch, and any package groups that are not associated with a despatch order. If set to a child despatch order, the search returns package groups associated with that child despatch order and its parent despatch order. If set to a parent despatch order, the search returns package groups associated with that parent despatch order and its child despatch orders.
    3. Click Search or press F3.

      The Package Groups table displays package groups that match the search criteria and:

      • Have a selectable status (if the Package Group status definition exists)
      • Are on the shipment

      Package groups that have rejected packages are red. Package groups that have recycled packages are green. Package groups that have both rejected and recycled packages are red.

    4. To view the quality of package groups, Show Analyte Group. Select from:
      • Analyte groups, as defined on the Quality panel of the Solution Explorer—A column for each analyte in the group displays.
      • Show All Analytes—A column for each analyte that has data displays.
    5. Check Selected for each package group to be unloaded.
    6. To select individual packages or child package groups within a parent package group, expand the parent package group in the Package Groups table and check Selected for each package or child package group to be unloaded.

      Note: Unloading packages or child package groups from a parent package group unpacks them from the parent package group. If a package group has Keep Package Group Together checked, the packages and child package groups in the parent package group cannot be moved separately.

  8. Enter the Default Movement Date.
  9. Expand the movement flows and destinations in the Destinations field group.
  10. Drag one of the selected packages or package groups to the required destination.

    The Totals row in the Movements table displays quantities in the unit of measure of the first movement.

    If Start Unloading - Actual on the Route Plan tab is not yet defined for the route point, MineMarket updates it with the date and time of the first movement.

  11. Update the following details for each unloading movement as required.
    • Start Date
    • End Date
    • Despatch Order—Select from the despatch orders associated with the shipment. Default: The despatch order selected for the loading movement of the package or package group.
    • Number Of Units—Editable for a package movement but read-only for a package group movement.
    • Net Mass—Editable for a package movement but read-only for a package group movement. For packages with Preserve Tare Mass checked, do not edit the net mass here because the net mass is calculated from the gross mass and displays correctly on the Package, even though the Movements table does not display the calculated net mass.
    • Gross Mass—Editable for a package movement but read-only for a package group movement.
  12. To assign the same despatch order to multiple movements:
    1. Check Selected for the movements or:
      1. Highlight the movements. (Click the first movement in the sequence, hold down Shift, then click the last movement in the sequence; or hold down Ctrl while clicking non-consecutive movements.)
      2. Right-click and select Select Highlighted Rows from the menu.
    2. Right-click and select Assign To Despatch Order » [Despatch Order] from the menu.
  13. To delete a movement, right-click the movement and select Delete from the menu.
  14. To delete multiple movements:
    1. Check Selected for the movements.
    2. Right-click and select Delete from the menu.
  15. Click Save.