Managing Scheduled Events
Tasks can be triggered based on schedules. The schedules determine the day, frequency and duration when the task is run.
Each task configuration has a Scheduled Event Settings section with the following fields.
- Name—You can rename the task.
- Retry Attempts—Number of times IMS Integration Hub should try to complete the task. Default: 3.
- Log Successful Runs—Whether to log each successful run of the task.
- Disable Event—You can configure the task but have it disabled if required.