Multimine Scheduler (MMS)

Multimine Scheduler (hereafter referred to as "Multimine") supports the simultaneous scheduling of several mines represented by distinct models.

Multimine is most useful for generating optimal life-of-mine plans across multiple operations. Multimine projects are independent of single-mine projects, but compatible project data can be transferred between them.

To create a Multimine project in Studio NPVS+, select Multi-mine during project creation. The project is saved with the .mmsp file extension. The available Multimine tasks are Import, Economic Model and Schedule.

Studio NPVS+ can also open existing Studio NPVS and NPV Scheduler Multimine projects. Summaries and reports for imported models and economic models are retained when you save the converted project in the Studio NPVS+ .mmsp format. Ultimate Pit, Pushbacks and Schedule settings and results are not carried over. See SNPVS to SNPVS+.