|
Move to the previous scheduling period |
Previous Period
To access this command:
-
Activate the Schedule ribbon and select Schedule | Previous.
This button moves the schedule to the previous period and updates the relevant control bars, e.g.Schedulecontrol bar, with the relevant information.
|
When scheduling, the current period number can be see in the drop-down list below. |
Related Topics | |
|
Schedule
Selected Blocks Undo Mining Next Period Adjust Schedule |