|
Survey Database - ROM Stockpile Boundaries Using data within the Survey Database Folder |
Survey Database - ROM Stockpile Boundaries
To access this menu:
-
Display the Project Data control bar, expand the Survey Database folder. A ROM Stockpile Boundaries sub-folder can be found at either the global or ROM level, depending on its Data Scope setting.
ROM Stockpile Boundaries - Data Usage
Any ROM Stockpile Boundaries folder within the Survey Database will contain perimeters used to constrain the generation of cut-and-fill stockpile volumes using the ROM reporting tool.
ROM Stockpile Boundaries are added to your Survey database using
the Add
to Database tool.
Global and ROM-specific Data
Data of this type can be found at one of two levels in the Survey Database 'tree':
- Global: ROM data that can be accessed regardless of the current Rom setting. Data at this level will be used if data of the same type cannot be found (for the given survey date) at the ROM level.
- ROM: data at this level can only be accessed by reports run for a particular ROM. If an EOM ROM report is run for a given date, which doesn't exist at the ROM level, the Global level will be used instead. If nothing can be found at the global level, reporting will be cancelled.
Within each folder, one more date folders may appear. These represent the date associated with the data when it was added to the Survey Database.
Find out more about Data Scope within the Survey Database...
Loading 3D Survey Data
You can load data from any date folder at any level, and even load surfaces from multiple dates to for a visual comparison.
This data is used in the generation of cut-and-fill stockpile volumes using the ROM reporting tool.
ROM Stockpile Boundaries
are added to your Survey database using the Add to Database tool.
ROM Stockpile Boundaries - Survey Database Locations
Depending on the chosen Data Scope, data will be found in the database at one of the following locations:
Survey Database
- (Path to Survey Database)
- ROM Stockpile Boundaries (Global Data Scope)
- ROMs
- [ROM Name]
- ROM Stockpile Boundaries (Pit-level Data Scope)
Each data folder will be further categorized by a date sub-folder. This will contain the data that relates to a particular generation date.
More about the Project Data control bar's Survey Database folder...
Related Topics | |
|
Copyright © Datamine Corporate Limited
JMN 20045_00_EN