Scheduling Setup: Options
This screen is used to set general Maroma scheduler settings. In effect, these define base 'rules' for the scheduler aside from those required by preceding screens.
These options are:
Stockpiles type |
Choose from:
Maximum periods to reclaim—Material from stockpiles is considered up to the specified maximum (from the scheduled period). |
Optimizer switches to Multipass... | Set the number of periods at which the scheduler swaps to a sliding window heuristic to solve the optimal schedule. |
Schedule all blocks... |
|
Maximum benches in a mining block | Define the maximum number of benches per mining block (1, 2 or 3). The default is 2. |
Solver timeout | Set the maximum time in minutes for the solver to discover an optimal schedule solution, otherwise returning the most profitable solution found so far. |
Number of cores | The Maroma scheduler will utilize multiple CPU threads if they are available. Set the maximum number of cores to use for solving the schedule here. |
Related topics and activities
-
Scheduling Pushbacks