Change the Drilled Status of Holes

If you enter drilled data for holes (see Enter Drill Log Data and Import a Drill Navigation Log), those holes are automatically flagged as drilled. Use this activity to manually change the drilled status if required.

To flag holes as drilled:

  1. Select the Drill module.
  2. Select a drill pattern in the DataBlast Items Tree.

    The drill pattern displays in the Viewport.

  3. Select or filter holes as required. See Select Objects in the Viewport and Filter Displayed Holes.
  4. On the Drill Ribbon Menu, in the Drill group, click Flag as Drilled.

    The Action Date/Time screen displays.

  5. Select the Action Date/Time from:
    1. Start of Current Shift (default)—For shift configuration, see Maintain Shifts.
    2. Current Date/Time
    3. Custom Date/Time—Update the Date and Time as required.
  6. Click OK.

    The Drilled Date is updated in the Hole Properties.

    Note: A drilled hole has 'as-built' data and cannot be modified in the Design Module.

  7. Click Save Changes.

To flag holes as not drilled:

  1. Select the Drill module.
  2. Select a drill pattern in the DataBlast Items Tree.

    The drill pattern displays in the Viewport.

  3. Select or filter holes as required.
  4. On the Drill ribbon menu, in the Drill group, click Remove Drilled Flag.

    A confirmation message displays.

  5. Click Yes.

    The Drilled Date is cleared in the hole properties.

  6. Click Save Changes.