Stockpile Supply Settings
To access this screen:
-
On the Scheduling Setup screen, select or add a stockpile destination type and enable the Supply tab.
The Supply screen is used to define the initial and subsequent periods' material mass, density and grade/quality settings. It is part of the settings defined for a stockpile destination type. It represents some of the settings defined for a stockpile destination type.
Activity steps:
- Display the Stockpile Supply Settings screen.
- In Period, select a period number from the list (the default first period is ‘Initial’).
- In Tonnes, enter a material mass value (tonnes) for the selected period.
- In Density, enter a material density value (g/t) for the selected period.
- In Numeric Field 1, Numeric Field 2, Numeric Field 3, and other numeric fields, enter values for the various material attribute fields (for example rock type codes (for example NLITH) and grades (for example AU)) for the selected period.
Note: If the Maximum Capacity group’s Limited To parameter is set to a value which is smaller than the Tonnes value for a specific Period on this screen, selecting OK displays the warning “Maximum Capacity exceeded by Stockpile Supply”. The Supply grid is populated with accumulated values that are not used with machines. For more information on how accumulated field values are defined and used, click here.